Echte Ergebnisse aus den Bereichen Fertigung, Immobilien sowie Lebensmittel und Getränke – PM-Einhaltung, schnellere Schließungen und weniger Notjobs.
Kostenlos starten42% less unplanned downtime
A 120-person discrete manufacturing plant in the Baltics replaced spreadsheets with Maintoro for work orders and PM — cutting emergency jobs and improving shift handovers.
Geschichte lesen3× faster work order closure
A property management group with 14 buildings unified tenant requests, contractor jobs, and compliance inspections in one CMMS — with SLA visibility per site.
Geschichte lesenPM compliance 61% → 94%
An EU food & beverage processor digitised CIP, refrigeration, and packaging-line PM with meter reminders and sign-offs — passing SQF audit with zero major findings.
Geschichte lesen0 EC-chapter findings (down from 4)
A 180-bed regional community hospital migrated off paper PM logs to Maintoro and produced their first Joint Commission survey in 12 years with zero EC-chapter findings.
Geschichte lesenDispatch time −74% (87min → 23min)
A 240-store specialty retailer replaced their 1-800 dispatch service with Maintoro mobile work-request workflow — cutting average dispatch time and saving $180K/year on the prior contract.
Geschichte lesen0 FDA PAI maintenance findings (site record)
A 180,000-sqft sterile-fill pharmaceutical manufacturer migrated from paper-based PM tracking to Maintoro under formal validation protocol — and produced their first FDA PAI in 22 years with zero maintenance-related 483 observations.
Geschichte lesenMöchten Sie vorgestellt werden? Wir interviewen jetzt Teams.
Teilen Sie Ihre Geschichte →