maintoro
Tarifs
Architecture
Se connecterDémo du livreCommencez gratuitement
maintoro

GMAO moderne pour une disponibilitĂ© imparable. Bons de travail, maintenance prĂ©ventive et gestion des actifs — dans une seule application simple.

G2 4,8/5SOC2GDPROIN 27001Construit en Estonie
Produit
  • Bons de travail
  • Entretien prĂ©ventif
  • Suivi des actifs
  • Balises QR + NFC
  • Application mobile
  • Portail de demande de travail
  • API publique
Solutions
  • Fabrication
  • Gestion immobiliĂšre
  • Nourriture et boissons
  • Gestion des installations
  • HĂŽtels
  • Soins de santĂ©
  • Tous les secteurs →
Comparer
  • etMaintenirX
  • contre limbe
  • et UpKeep
  • contre Fiix
  • contre eMaint
  • Guide de migration
Apprendre
  • Blogue
  • Guides
  • Glossaire
  • ModĂšles
  • Calculatrices
  • Webinaires
  • Guide de l'utilisateur
  • TĂ©moignages de clients
Entreprise
  • À propos
  • CarriĂšres
  • Presse
  • RĂ©servez une dĂ©mo
  • Contact
  • SĂ©curitĂ©
  • IntĂ©grations
  • Partenaires
  • Statut

© 2026 Maintoro OÜ · Tallinn, Estonia · hello@maintoro.com

ConfidentialitéCookiesGDPRTermes
Tous les modĂšles
Excel·6 min read

Technician Timesheet Template

Weekly timesheet with work orders, hours, and supervisor sign-off.

Utilisation Ă  Maintoro Dossier de demande

Ce qui est inclus

Technician name and week
Daily hours
Work order references
Overtime flag
Travel time
Parts issued
Supervisor approval
Notes

Link labor cost to work orders

A maintenance technician timesheet is more than a payroll record — it is the link between labor cost and the work being performed. When labor hours are recorded against specific work orders, you can answer "what did this PM cost us?" or "how much labor did the conveyor 3 breakdown cost?" Without that linkage, labor cost is just a payroll line item disconnected from operational reality. This template captures hours per work order, distinguishes regular from overtime, separates travel time, and includes supervisor sign-off for approval. Suitable for SMB maintenance teams of any size, contractor coordination, and SLA reporting where labor accountability matters.

How to record time accurately

Practical guidance:

Approval and reporting workflow

Standard approval workflow:

Common mistakes

Most common timesheet mistakes:

Industry-specific patterns

Manufacturing maintenance teams use technician timesheets for cost-per-asset analysis (labor cost over time per machine), capital-replacement decision support (rising labor cost suggests asset reaching end of life), and OEE root-cause analysis (downtime decomposition). Property management teams use timesheets for tenant chargebacks (labor cost per work request) and contractor coordination (in-house vs contractor cost comparison). Service contractor businesses use timesheets for SLA reporting (response and resolution times) and customer billing (hours × rate). The core fields stay consistent across industries; the downstream reporting differs.

Beyond paper timesheets — mobile time tracking

Modern CMMS like Maintoro captures labor time as a byproduct of mobile work-order completion. Technicians clock in/out on each work order through the mobile app — no separate timesheet to fill out. Hours flow automatically into work-order cost reports, asset cost-history, and supervisor approval workflows. The administrative burden of weekly timesheets disappears when time tracking is integrated with the work being performed.

FAQ

Common technician timesheet questions:

Log labor on work orders automatically

Technicians clock time inside Maintoro mobile during real work. No duplicate entry. Cost-per-asset reports built in.

Commencez gratuitement