maintoro
Prissättning
Arkitektur
Logga inBokdemoBörja gratis
maintoro

Modernt CMMS för ostoppbar drifttid. Arbetsorder, förebyggande underhåll och tillgångshantering – i en enkel app.

G2 4,8/5SOC 2GDPRISO 27001Byggd i Estland
Produkt
  • Arbetsorder
  • Förebyggande underhåll
  • Spårning av tillgångar
  • QR + NFC-taggar
  • Mobilapp
  • Arbetsförfrågningsportal
  • Offentligt API
Lösningar
  • Tillverkning
  • Fastighetsförvaltning
  • Mat & dryck
  • Facility Management
  • Hotell
  • Sjukvård
  • Alla industrier →
Jämföra
  • vs MaintainX
  • vs Limble
  • vs UpKeep
  • mot Fiix
  • vs eMaint
  • Migrationsguide
Lära sig
  • Blogg
  • Guider
  • Ordlista
  • Mallar
  • Miniräknare
  • Webbseminarier
  • Användarhandbok
  • Kundberättelser
Företag
  • Om
  • Karriärer
  • Trycka
  • Boka en demo
  • Kontakta
  • Säkerhet
  • Integrationer
  • Partners
  • Status

© 2026 Maintoro OÜ · Tallinn, Estonia · hello@maintoro.com

PrivatlivSmåkakorGDPRVillkor
Alla mallar
Excel·8 min read

PM Schedule Template

Annual preventive maintenance planner with daily, weekly, monthly, and custom intervals.

Använd i Maintoro Begär fil

Vad ingår

Asset / system name
PM task description
Frequency (daily–annual)
Last completed date
Next due date
Assigned owner
Estimated duration
Checklist reference

Build a defensible PM program

A documented PM schedule is the foundation of any maintenance program that aims for 80%+ PM compliance. Without a written schedule, PM "happens" only when there is time — which means it gets crowded out by reactive work, and the program effectively does not exist. This template gives you a structured way to list every asset, every recurring maintenance task, and every interval before automating reminders in software. The template covers calendar-based PM (every 30/60/90 days), meter-based PM (every 500 hours of operation, every 10,000 cycles), and condition-based PM (when sensor readings cross thresholds). Most SMB teams start with calendar-based PM only and add meter-based later as they get comfortable.

Step 1: Rank assets by criticality

Before scheduling any PMs, rank your assets:

Step 2: Choose intervals from the right source

PM interval sources in priority order:

Step 3: Write specific checklists per PM

A PM checklist must define exactly what to inspect, test, lubricate, and adjust — with specific pass/fail criteria. "Inspect bearing" is too vague. "Check bearing temperature with infrared — pass if under 85°C, fail if over 100°C; investigate if 85–100°C" is specific enough that any technician can complete the PM consistently. Specific criteria are what make PM compliance percentages meaningful — without them, "PM completed" can mean anything from a thorough inspection to a casual glance.

Best practices and common pitfalls

The most common PM scheduling mistake is over-specification: scheduling weekly PMs on every asset because "more is better." This produces a schedule no team can actually complete. PM compliance drops to 50–60%, the schedule loses credibility, and people stop trusting it. Better to schedule fewer PMs that actually get completed than many PMs that are routinely skipped. A second common mistake is not adjusting intervals based on completion data. If your records show 30 consecutive PMs of "no action required," the interval may be over-specified. If you keep finding wear at PM time, the interval may be appropriate or need to be shortened. Review and adjust intervals quarterly.

Migrating to automated PM in a CMMS

When the spreadsheet PM schedule grows past 30–50 active PMs, the manual reminder discipline breaks down. PMs slip past due dates without anyone noticing. At this point, moving to a CMMS like Maintoro is the right call — Maintoro auto-generates PM work orders on schedule, escalates overdue items, and surfaces compliance percentages on real-time dashboards. PM compliance typically lifts from spreadsheet-era 55–70% to 85%+ within the first quarter post-deployment, with no additional administrative burden.

FAQ

Common questions about PM scheduling:

Auto-generate PM work orders

Maintoro creates work orders on schedule — with checklists, mobile execution, and real-time compliance dashboards.

Börja gratis