maintoro
Tarifs
Architecture
Se connecterDémo du livreCommencez gratuitement
maintoro

GMAO moderne pour une disponibilitĂ© imparable. Bons de travail, maintenance prĂ©ventive et gestion des actifs — dans une seule application simple.

G2 4,8/5SOC2GDPROIN 27001Construit en Estonie
Produit
  • Bons de travail
  • Entretien prĂ©ventif
  • Suivi des actifs
  • Balises QR + NFC
  • Application mobile
  • Portail de demande de travail
  • API publique
Solutions
  • Fabrication
  • Gestion immobiliĂšre
  • Nourriture et boissons
  • Gestion des installations
  • HĂŽtels
  • Soins de santĂ©
  • Tous les secteurs →
Comparer
  • etMaintenirX
  • contre limbe
  • et UpKeep
  • contre Fiix
  • contre eMaint
  • Guide de migration
Apprendre
  • Blogue
  • Guides
  • Glossaire
  • ModĂšles
  • Calculatrices
  • Webinaires
  • Guide de l'utilisateur
  • TĂ©moignages de clients
Entreprise
  • À propos
  • CarriĂšres
  • Presse
  • RĂ©servez une dĂ©mo
  • Contact
  • SĂ©curitĂ©
  • IntĂ©grations
  • Partenaires
  • Statut

© 2026 Maintoro OÜ · Tallinn, Estonia · hello@maintoro.com

ConfidentialitéCookiesGDPRTermes
Tous les modĂšles
Excel·8 min read

PM Schedule Template

Annual preventive maintenance planner with daily, weekly, monthly, and custom intervals.

Utilisation Ă  Maintoro Dossier de demande

Ce qui est inclus

Asset / system name
PM task description
Frequency (daily–annual)
Last completed date
Next due date
Assigned owner
Estimated duration
Checklist reference

Build a defensible PM program

A documented PM schedule is the foundation of any maintenance program that aims for 80%+ PM compliance. Without a written schedule, PM "happens" only when there is time — which means it gets crowded out by reactive work, and the program effectively does not exist. This template gives you a structured way to list every asset, every recurring maintenance task, and every interval before automating reminders in software. The template covers calendar-based PM (every 30/60/90 days), meter-based PM (every 500 hours of operation, every 10,000 cycles), and condition-based PM (when sensor readings cross thresholds). Most SMB teams start with calendar-based PM only and add meter-based later as they get comfortable.

Step 1: Rank assets by criticality

Before scheduling any PMs, rank your assets:

Step 2: Choose intervals from the right source

PM interval sources in priority order:

Step 3: Write specific checklists per PM

A PM checklist must define exactly what to inspect, test, lubricate, and adjust — with specific pass/fail criteria. "Inspect bearing" is too vague. "Check bearing temperature with infrared — pass if under 85°C, fail if over 100°C; investigate if 85–100°C" is specific enough that any technician can complete the PM consistently. Specific criteria are what make PM compliance percentages meaningful — without them, "PM completed" can mean anything from a thorough inspection to a casual glance.

Best practices and common pitfalls

The most common PM scheduling mistake is over-specification: scheduling weekly PMs on every asset because "more is better." This produces a schedule no team can actually complete. PM compliance drops to 50–60%, the schedule loses credibility, and people stop trusting it. Better to schedule fewer PMs that actually get completed than many PMs that are routinely skipped. A second common mistake is not adjusting intervals based on completion data. If your records show 30 consecutive PMs of "no action required," the interval may be over-specified. If you keep finding wear at PM time, the interval may be appropriate or need to be shortened. Review and adjust intervals quarterly.

Migrating to automated PM in a CMMS

When the spreadsheet PM schedule grows past 30–50 active PMs, the manual reminder discipline breaks down. PMs slip past due dates without anyone noticing. At this point, moving to a CMMS like Maintoro is the right call — Maintoro auto-generates PM work orders on schedule, escalates overdue items, and surfaces compliance percentages on real-time dashboards. PM compliance typically lifts from spreadsheet-era 55–70% to 85%+ within the first quarter post-deployment, with no additional administrative burden.

FAQ

Common questions about PM scheduling:

Auto-generate PM work orders

Maintoro creates work orders on schedule — with checklists, mobile execution, and real-time compliance dashboards.