maintoro
Hinnakiri
Arhitektuur
Logi sisseBroneeri demoAlusta tasuta
maintoro

Kaasaegne CMMS peatamatuks tööajaks. Töökorraldused, ennetav hooldus ja seadmehaldus — ühes lihtsas rakenduses.

G2 4.8/5SOC 2GDPRISO 27001Loodud Eestis
Toode
  • Töökorraldused
  • Ennetav hooldus
  • Seadmehaldus
  • QR + NFC sildid
  • Mobiilirakendus
  • Tööpäringu portaal
  • Avalik API
Lahendused
  • Tootmine
  • Kinnisvarahaldus
  • Toiduainetööstus
  • Hoonete haldus
  • Hotellid
  • Tervishoid
  • Kõik tööstused →
Võrdle
  • vs MaintainX
  • vs Limble
  • vs UpKeep
  • vs Fiix
  • vs eMaint
  • Migreerimisjuhend
Õpi
  • Blogi
  • Juhendid
  • Sõnastik
  • Mallid
  • Kalkulaatorid
  • Veebiseminarid
  • Kasutusjuhend
  • Kliendilood
Ettevõte
  • Meist
  • Karjäär
  • Press
  • Broneeri demo
  • Kontakt
  • Turvalisus
  • Integratsioonid
  • Partnerid
  • Staatus

© 2026 Maintoro OÜ · Tallinn, Eesti · hello@maintoro.com

PrivaatsusKüpsisedGDPRTingimused
All case studies
Food & beverage·EU

PM compliance from 61% to 94% before audit season

An EU food & beverage processor digitised CIP, refrigeration, and packaging-line PM with meter reminders and sign-offs — passing SQF audit with zero major findings.

PM compliance 61% → 94%
Food processing · 2 plants12 maintenance · 3 quality inspectorsPlant 1 in 3 weeks · Plant 2 in 5 weeks
61% → 94%
PM compliance
−71%
Overdue CIP tasks
0
Audit findings (major)

The challenge

Paper PM sheets for CIP and cold storage were often completed late or without signatures. Quality needed traceability from task to technician to timestamp.

What they implemented

Critical assets were tagged; PM templates mirrored HACCP checkpoints. Overdue tasks escalated to the maintenance lead and quality alias.

  • Time- and meter-based PM for lines and utilities
  • Required photo + sign-off on CIP cycles
  • Audit export of completed PM for 12 months

Audit result

SQF audit found zero major maintenance documentation gaps. Compliance rate on scheduled PM rose from 61% to 94% within one production quarter.

“Inspectors could pull a year of PM history in minutes. We are not scrambling the week before audit anymore.”

Quality & Maintenance Lead · EU processor

Audit-ready maintenance records

Checklists, sign-offs, and exports built for regulated environments.

Start free